Energy Storage News - May 15th, 2020
This week’s TOP 5 talks about Hawaii’s approval of 459MW/2,900MW worth of solar plus storage projects, the go-ahead for Nevada’s massive Gemini Solar Project, Tesla’s selection to deliver a 100MW/400MWh storage system in Ventura - California, Form Energy’s 150-hour storage pilot project in Minnesota and Saudi Arabia’s upcoming 3 GWh flow battery factory.
Foreword: Did you know that Clean Horizon will be delivering a three-part training series on May 26, 28 and June 02? If interested, contact us at training@cleanhorizon.com or check our online store.
-
Hawaiian Electric approved 16 solar-plus-storage and standalone projects for a total of 459 MW of generation and 2,900 MWh of storage.
-
The 690-MW solar plus 380-MW/1400-MWh storage Gemini Solar project was approved by the US Department of Interior.
-
Strata Solar selected Tesla to equip its 100MW/400MWh Ventura Energy Storage project in California.
-
Energy cooperative Great River Energy teamed up with technology developer Form Energy to replace a coal unit with a 1MW/150MWh “aqueous air flow” battery.
-
German equipment provider SCHMID and Saudi chemical leader SABIC joined forces to develop a 3 GWh vanadium redox flow battery factory in Saudi Arabia.